Comprehensive electrical infrastructure installation for M/s Hitachi Astemo at their Noida automotive component manufacturing facility. The project encompassed LT panel installation including UPS type, single-phase, and 3-phase panels, extensive multi-gauge cable installation, and dual transformer installations (5 kVA & 150 kVA). Project cost: ₹5.00 Cr.

M/s Hitachi Astemo — Noida, Uttar Pradesh
Project Details
| Client | M/s Hitachi Astemo |
| Location | Noida, Uttar Pradesh |
| Completion | 2024 |
| Scope of Work | LT panel installation (UPS type, single phase, three phase); cable installation; transformer installation (5 KVA and 150 KVA); cable laying across multiple gauges — 300 sq mm, 240 sq mm, 185 sq mm, 95 sq mm, 10 sq mm, 6 sq mm, 3 sq mm, 2.5 sq mm. |
Challenge
Managing high-density, multi-tier cable routes across 8 distinct cable cross-sections while integrating ultra-sensitive UPS power supplies for automated precision automotive manufacturing lines.
Solution
Engineered segmented multi-tier galvanized cable ladder systems preventing harmonic interference, deployed calibrated torque termination for all heavy lugs, and conducted comprehensive load bank testing across circuits prior to final commissioning.